Projects
Second bridge with sorting arm
20 March 2021 / by: Nico Heijmans
Today we installed a second bridge including a second sorting arm at an existing plate warehouse at our customer Jetstone.
In order not to stop the production of Jetstone, we have planned the work and installation on Saturday in consultation with Jetstone. Today we have installed a second bridge with sorting arm on the existing automatic plate warehouse. The sorting arm is mainly needed to expand the capacity of the plate warehouse.
“Jetstone: Collaboration, reliable, solution-oriented”